![]() Water and sewer utilities throughout the length of the project and the addition of LED street and pedestrian lighting. ![]() Will replace the Hillsborough Street and Pullen Road traffic signal with aĭual-lane roundabout, and replace the existing concreteĪnd brick sidewalks. Seven-foot wide raised median, sidewalk bulb-outs and several pedestrian signals. Median-divided street with on-street parking on both sides, a The project will convert Hillsborough Street to a two-lane, The Hillsborough Street Project is set to break ground on May 20. for the Hillsborough Street Project Phase I, which extends from The City has a $9.92 million contract with Hamlett and Associates, Will allow for interested persons to drop by anytime within the 3 The meeting will have an informal floating format that Hillsborough Street Partnership offices at 2100-200 Hillsborough St. Information and answer questions about Phase I of the Hillsborough Persons are invited to attend the first community meeting to provide Hillsborough Street Meetingīusiness leaders, residents, students and interested
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |